Havacılık Eğitimleri

Teknik Eğitimler

  • Module 9 (EASA Part 66, Human Factors)
  • Module 10 (EASA Part 66, Aviation Legislation)
  • Human Factors (GM 145.A.30 (e))
  • EASA Part 145 – SHGM SHY 145
  • EASA Part M – SHGM SHY M
  • EASA Part 66/147 – SHGM SHY 66/147
  • Electrical Wiring Interconnection System (EWIS) (Group 1-2)
  • Electrical Wiring Interconnection System (EWIS) (Group 3-8)
  • Fuel Tank Safety /CDCCL (Phase I)
  • Fuel Tank Safety /CDCCL (Phase II)
  • Incoming Inspection Training (ESD, HDI, ATA Spec 300)
  • Safety Management System (SMS)
  • Aircraft Painting
  • Towing and Push – Back
  • Aircraft External Cleaning
  • Engine Run Up (Boeing B737 CFM 56, CFM LEAP 1-B)
  • Engine Run Up (Boeing B747 GE CF6, PW 4000)
  • Engine Run Up (Boeing B757 PW 2000, RR RB211)
  • Engine Run Up (Boeing B767 GE CF6, PW 4000, RR RB 211)
  • Engine Run Up (Boeing 777 GE 90, PW 4000, RR Trent 800)
  • Engine Run Up (Boeing B787 GEnx, RR Trent 1000)
  • Engine Run Up (Airbus A300-600 GE CF6, PW 4000)
  • Engine Run Up (Airbus A319/320/321 V2500, CFM 56, LEAP 1A, IAE PW 1100 G)
  • Engine Run Up (Airbus A330 GE CF6, PW 400, RR TREND 700)
  • Borescope Inspection (Airbus A350 RR Trent XWB)
  • Borescope Inspection (Boeing B737 CFM 56, CFM LEAP 1-B)
  • Borescope Inspection (Boeing B747 GE CF6, PW 4000)
  • Borescope Inspection (Boeing B757 PW 2000, RR RB211)
  • Borescope Inspection (Boeing B767 GE CF6, PW 4000, RR RB 211)
  • Borescope Inspection (Boeing 777 GE 90, PW 4000, RR Trent 800)
  • Borescope Inspection (Boeing B787 GEnx, RR Trent 1000)
  • Borescope Inspection (Airbus A300-600 GE CF6, PW 4000)
  • Borescope Inspection (Airbus A319/320/321 V2500, CFM 56, LEAP 1A, IAE PW 1100 G)
  • Borescope Inspection (Airbus A330 GE CF6, PW 400, RR TREND 700)
  • Borescope Inspection (Airbus A350 RR Trent XWB)